Skip to the page
Conservatory Roof ReplacementSwindonGet a quote

Swindon Building Control Fees: Pricing Up a Solid Roof

Approval for a solid roof is rarely free. This page puts a number on it. We took the charges Swindon Borough Council publishes and set them beside what the councils around it publish.

A still lake framed by trees and tall reeds under a clear sky, with a paddleboarder far out on the water

Swindon: the fee follows the price of the job

There is no conservatory line in Swindon's charges. A solid roof sits most naturally under alterations, where the council sets the fee by the total estimated cost of the work, and the same figure applies whether you choose full plans or a building notice.

That has a handy side effect. Because tiled roofs on most conservatories fall somewhere between £6,000 and £15,000 on our national guide, the fee for a typical job lands in one of three alteration bands. Push the job past a band edge, with a lantern or strengthening, and the fee steps up with it.

Every Swindon figure below includes VAT at 20% and comes from the council's schedule for 2026/27, valid from 6 April 2026.

Alterations costing £10,001 to £15,000

£720

Swindon Borough Council, full plans or building notice, VAT included

Every Swindon category that could apply

Category, as the council names itCharge
Replacement roof covering (Re-covering an existing roof)£288
Alterations, total estimated cost £5,001 to £10,000£648
Extensions up to 10m2£720
Alterations, total estimated cost £10,001 to £15,000£720
Alterations, total estimated cost £15,001 to £20,000£864
Extensions 10 to 40m2£936

Source: Swindon Borough Council building control charges, 2026/27, valid from 6 April 2026. Which category your job falls into is for building control to decide.

Next door: how the neighbours compare

Comparing councils is awkward because none of them prints a conservatory roof price, and the categories do not line up neatly. The one line all of these councils share is a small extension, and it is relevant: the Vale of White Horse treats a conservatory that has lost its exemption as an extension for charging.

Small extension charge, full plans route, VAT included (hover or tap a bar for the category)
  1. Swindon Borough CouncilExtensions up to 10m2£720
  2. Vale of White HorseSingle storey extension up to 10m2£678
  3. Cotswold District CouncilExtension up to 20m2£595

Category sizes differ: Cotswold's line covers extensions up to 20m2, the others up to 10m2.

What each neighbour publishes

Vale of White Horse (South and Vale building control)

Category: Alterations by estimated cost (codes B56 and B57); Single storey extension up to 10m2 (B02)

  • Alterations up to £5,000: £435.60 (full plans) or £522 (notice)
  • Alterations over £5,000 to £10,000: £544.80 (full plans) or £652.80 (notice)
  • Single storey extension up to 10m2: £678 (full plans) or £813.60 (notice)

2026/27, from 1 April 2026. Figures above include VAT; the council also lists them before VAT. No conservatory category. Under its scheme, a formerly exempt conservatory is priced on the extension scale.

Council charges document

Cotswold District Council

Category: All other work (alterations) by estimated cost; Extension up to 20m2

  • Alterations under £1,000: £165.00
  • Alterations £1,001 to £5,000: £310.00
  • Extension up to 20m2: £595 (full plans) or £660 (notice)

2026/27, document dated 20 March 2026. Figures above include VAT; the council also lists them before VAT. No conservatory category, and no alteration band above £5,000 was shown.

Council charges document

No figure we could show

  • Wiltshire Council: we could not locate a readable copy of its charges, so it sits out of the comparison.
  • West Berkshire Council: its charging document would not open for us, so no number appears here.

What you get for the fee

Is it just a rubber stamp? Not really. The charge pays for building control to check the roof meets the Building Regulations, which for a solid roof means the energy rules and the structure carrying it.

  • Full plans: drawings are checked before work begins, with a decision due in five weeks (two months if you agree), then inspections and a completion certificate.
  • Building notice: no drawings in advance; work can begin two days after the notice, and it is checked on site as it goes.
  • Regularisation: the route for work already done without approval, usually dearer and sometimes involving opening work up.

In Swindon, full plans and building notice cost the same for alterations, so the choice comes down to how much certainty you want before the roof goes up. Whether you need approval in the first place is covered on the Swindon conservatory roof regs page.

Who usually pays it

It varies. Some firms make the application and fold the fee into their quote; with others the application, and the bill from the council, are yours. Neither is wrong, but you should know which you are getting before you compare prices.

Remember too that the fee is set on the estimated cost of the work, so ask what figure the firm will put on the application. The conservatory roof price guide gives typical ranges to sense-check it against.

How we put this together

We read each council's own published charges document for the current year and copied the figures and category names exactly as printed. Where a council showed prices before and after VAT, we show the VAT-inclusive figure. We did not estimate, average or adjust anything.

One caution on dates. Fresh regulations on how councils charge for building control came in, for the most part, from 6 November 2026, and each council has to put out a new scheme. Spring 2026 schedules could therefore be overtaken, so look at the council's live page before relying on a figure.

No council here has a conservatory roof category, so we show the alteration bands and the small extension line, the two places such a job is most likely to land. Your own council's building control team decides the actual category.

Find a firm who will handle the paperwork

Plenty of local roof firms apply to building control as part of the job. Your postcode gets the search going.

Want the detail first? Read how requests go.

Your details

Our job is to track down a roof firm working close to you. You learn who they are first, and they see nothing of yours until you agree. It is free to use.

Get a quote